Home01 About Us02 Services03 Standards04 Industries05 FAQ06 Contact07
01 Home 02 About Us 03 Services 04 Standards 05 Industries 06 FAQ 07 Contact
Home / Services
What We Do

Services built for
real compliance

From a single electrode installation to a complete lightning protection system for an industrial facility — explore our full range of services, the materials we use, and our step-by-step process.

Our Services

Six specialised
services

From a single copper bonded rod installation to a complete IEC 62305 lightning protection system — we handle the full technical scope with written documentation on every job.

01
Earthing System Installation
Complete earthing system design and installation using copper bonded rods, GI strip conductors, chemical compound, inspection chambers, and clamps. Single electrode to multi-rod ring configurations for any application.
Copper bonded rodsGI stripChemical compoundIS 3043
02
Earth Resistance Testing
3-point fall-of-potential testing using calibrated earth resistance testers. Individual electrode testing, combined system measurement, and annual compliance testing. Test readings documented and provided to client.
Fall-of-potentialCalibrated instrumentsIS 3043 method
03
Lightning Protection Systems
External LPS installation per IEC 62305 — air terminals, copper tape down conductors, test joints, ring earth electrode, and vertical rod termination network. Rolling sphere method design approach.
IEC 62305Air terminalsDown conductorsRing earth
04
Solar PV Earthing
Mandatory earthing for rooftop and ground-mount solar installations. Structure bonding, inverter earth, DC circuit earthing, and array frame bonding per CEA Solar Regulations and IS 13947.
CEA Solar RegsIS 13947Structure bonding
05
Annual Maintenance
Annual earthing system inspection, resistance testing, compound replenishment, connection tightening, and compliance documentation. Annual maintenance contracts available for commercial and industrial clients.
Annual contractsCEA complianceCompound refill
06
Material Supply
Earthing materials including IS-specification copper bonded rods, GI and copper strip, chemical earthing compound, clamps, inspection chambers, and air terminals. Quality-checked from trusted suppliers.
IS specificationQuality checkedAll major products
Products

What we install & supply

IS 3043 specification materials. Every product we supply is checked against Indian Standards before installation.

Copper bonded, GI pipe, and stainless steel earthing electrodes
Top Seller
Copper Bonded Rod
High-carbon steel core with electrolytic copper bonding. Minimum 250 micron copper per IS 3043. Available in 14.2mm and 17.2mm diameter.
Lengths: 1.2m · 1.5m · 2m · 3m · Lifespan: 15–25 years
Copper strip, GI strip, and copper busbar conductors
High Volume
GI Strip Conductor
Hot-dip galvanised iron strip — minimum 70 micron zinc coating per IS 4736. Main earthing conductor running through buildings.
Sizes: 25×3mm · 32×6mm · 50×6mm · Sold per kg or metre
PrimeEarth earthing compound bag and bucket
Repeat Purchase
Earthing Compound
Hygroscopic chemical compound packed around the electrode. Maintains soil moisture and low resistivity year-round. Bentonite, GEM, and CBM types available.
Pack sizes: 5kg · 10kg · 25kg · 50kg
ESE air terminal, air terminal, down conductor and earth rod
LPS Component
Air Terminal (Finial)
Copper or aluminium pointed rod mounted at the highest point of a structure. Preferred strike attachment point for the lightning protection system.
Dia: 10–16mm · Height: 300–600mm · Copper or aluminium
Our Process

From site visit to test certificate

01
Site Visit & Assessment
We visit your site, assess soil conditions, review existing systems, and understand your compliance requirements. No cost, no obligation.
02
Written Quotation
Detailed written quotation specifying electrode type, depth, conductor sizing, compound quantity, applicable standards, and total cost. No verbal-only commitments.
03
Installation
IS 3043 compliant installation using quality-verified materials. Inspection chamber placed at every electrode for future testing access.
04
Testing (48 hrs after)
Fall-of-potential earth resistance test performed 48 hours after installation using calibrated tester. Three-probe method per IS 3043.
05
Documentation Handover
Test readings, electrode details, and compliance notes documented and formally provided to the customer. Your CEA compliance record is ready.
Chat on WhatsApp